Portfolio

RG Falla Ltd

Les Beaucamps High School - Phase 2 Sportshall

Architect: Design Engine Architects Ltd

Les Beaucamps High School Development is the construction of a new high school to replace the existing school on site. The scheme comprises 3,500m2 of single ply warm roofing over a variety of spaces to achieve required acoustic sound reduction requirements and thermal performance.

Alltech roofing’s scope of works includes the supply and installation of Corus perforated/diagram D100 metal deck and Corus perforated/diagram  HLT 130/600 tray over swimming pool and gymnasium areas. Acoustic insulation to achieve decibel sound reduction requirements and single ply warm roof mechanically fastened to achieve 0.20 W/m2K. Single ply warm roof construction is specified over changing rooms and single ply to Muga canopies.